SBM Offshore celebrates first steel cut for deepwater oil project’s floater

SBM Offshore has kicked off the construction phase of a disconnectable turret mooring (DTM) for a floating storage and offloading (FSO) unit, destined to be deployed at a deepwater oil project 30 km south of the Mexico-U.S. maritime border. The post SBM Offshore celebrates first steel cut for deepwater oil project’s floater appeared first on Offshore Energy.

Feb 15, 2025 - 20:30
 0
SBM Offshore celebrates first steel cut for deepwater oil project’s floater

SBM Offshore has kicked off the construction phase of a disconnectable turret mooring (DTM) for a floating storage and offloading (FSO) unit, destined to be deployed at a deepwater oil project 30 km south of the Mexico-U.S. maritime border.

The post SBM Offshore celebrates first steel cut for deepwater oil project’s floater appeared first on Offshore Energy.

What's Your Reaction?

like

dislike

love

funny

angry

sad

wow