Plug Power Cancels 100 MW Antwerp Plant

What happens when one of Europe’s flagship green hydrogen projects hits a wall? The quiet at the old Opel site in Antwerp’s NextGen District says it all. What was once a promising endeavor for large-scale green hydrogen production has fizzled out, as Plug Power Inc. has now scrapped its plans for a 100 MW electrolyzer plant at the Port of Antwerp-Bruges. The fallout from this could seriously reshape the future of hydrogen infrastructure in the area.
Background: Plug Power’s European Dream
Not too long ago, Plug Power was on the upswing. The company made a bold shift from just making fuel cells for forklifts to creating a complete green hydrogen ecosystem. Their big move? Securing a 30-year deal to set up CHYMIA—a 100 MW plant set to produce 35 tonnes of hydrogen every day. To put that in perspective, that’s about 12,500 tonnes a year of liquid and gaseous hydrogen, enough to really shake up transport, logistics, and heavy industries throughout Belgium and beyond.
Subscribe to read this article for free
Continue reading on Hydrogen Fuel News → · Subscribe
What's Your Reaction?
Like
0
Dislike
0
Love
0
Funny
0
Wow
0
Sad
0
Angry
0
Comments (0)